Purpose:
- To prepare a successful future for Veoneer and their suppliers, Veoneer’s suppliers shall utilize a lean manufacturing system within all of their facilities resulting in the best value and lowest risk products for the end customer.
- To inform new and existing suppliers about Veoneer's supplier manufacturing system requirements and recommended tools the supplier should use in its manufacturing system.
Input from Veoneer:
- Veoneer provides access through VSM to the VES-booklet (Veoneer Excellence System) and a list of reference literature.
- Initial introduction and awareness training coordinated through direct Veoneer purchase contact:
- Management training
- VPS booklet training, concepts and support tools.
Requirements:
- The supplier shall implement a lean manufacturing system. (Introduction of lean manufacturing is also part of Veoneer's VSDP (Veoneer Supplier Development Programme)
- The supplier shall nominate a lean manufacturing coordinator/champion.
- New and existing suppliers, who have not implemented a lean manufacturing system yet, shall establish a lean manufacturing implementation plan.
- Veoneer recommends to conduct an initial VES Assessment to establish current level and set priorities.
- The supplier shall identify potential manufacturing process improvements. The supplier is encouraged to use the VES Assessment Standard for that purpose as well.
- The supplier should implement internal workshops on the concepts and tools as follows:
The 8 VES concepts are: | VES-tools are for example: |
---|---|
Quality First |
5 Why |
Team Work |
Ishikawa diagram |
5S |
SPC |
Standards |
Quality Matrix |
Muda (Waste) Elimination |
Problem Solving Process |
TPM |
PDCA-wheel |
JIT |
FMEA |
Employee involvement |
Pareto Diagram |
Six-Sigma |
- Continuous improvement workshops shall be under a programme of regular management review of status, priorities and resources.
- The supplier shall implement lean manufacturing indicators with defined targets. Veoneer recommends the use of a QOS (Quality Operating System).
Output from Supplier:
- Supplier requests training assistance from Veoneer on demand.
- Productivity/operational efficiency improvements
- Cost reduction proposals
- Reduced process variation
- Reduction of inventory
- Lean manufacturing training- and implementation- plan and -status
- Implementation of lean manufacturing indicators
Required Documents:
- Lean manufacturing training- and implementation- plan and -status
- Documentation may be required on any or all aspects on a routine or occasional basis depending upon supplier performance.
Reference Documents:
- VSM-Product-Life Cycle/"Continuous Process and Cost Improvement"
- VSM-Veoneer Supplier Development Programme
- SQPS-061 (Presentation of Continual Improvement Process)
Latest revision
Date:
25/01/2022
Updated with SQPS-061 (VS061 is withdrawn).