4.2.1 Performance Review APQP-Closure

Purpose:

  • Eliminate risks to ensure 100% successful launch and serial production.
  • Ensure 100% of APQP (Advanced Product Quality Planning) activities are closed including both PPAP and S-APQP.

Input from Veoneer:

  • VS051 (Supplier Rating) results. (Note: All supplier factories are rated by all receiving Veoneer plants.)
  • Complaint reports, if any.

Requirements:

  1. Supplier Launch Performance Review:
  • Perform a launch and process review.
  • Follow-up any specified project QCD-targets (Quality/Cost/Delivery), (e.g. production efficiency, failure rates, delivery performance, customer feed-back etc.) and implement actions for any non-conformities.
  • Monitor early production containment (SQPS-412 Interim Inspection Plan) actions (if requested by Veoneer). If problems occur, define further countermeasures until problems are solved.
  • SQPS-412 actions can not be terminated before written approval from Veoneer has been issued.
  1. Closure of APQP (Advanced Product Quality Planning):
  • All open APQP issues shall be resolved and closed.
  • All Lessons Learned shall be identified, documented and implemented and if requested shared with Veoneer.
  • For all projects, the SQP project shall be documented and all required deliverables submitted through 'SQP IT application in APP' (see Training).
  1. Continuous Performance Monitoring:
  • For continuous performance monitoring the supplier shall follow the VS051 requirements and set up further relevant key indicators. "General Requirements/Specific Requirements/Manufacturing Systems“.
  • All VS051 and other relevant key indicators and referred action plans must be available for Veoneer review upon request.
  • Note: Supplier should carefully review his VS051-results on monthly basis. If supplier can not reproduce or does not agree to the VS051-results submitted by Veoneer, Supplier should answer to Veoneer immediately by using the VS051 Dispute form.

Output from Supplier:

  • Zero-defects.
  • Quality performance according to specifications.
  • 8D reports and action plans for any non-conforming issues.
  • 100% on time deliveries.
  • Closure of S-APQP by submission of above necessary deliverables to Veoneer SQ through the SQP project task 'project closure' using 'SQP IT application in VPP'.

Required Documents:

Reference Documents:

Latest revision
Date:
13/10/2020

Updated broken links.